Start with the year you are most likely to underestimate
Low-flow seasons expose the assumptions hidden inside an otherwise tidy feasibility study. The right question is not only how much water passes the intake, but how the scheme behaves when the river is doing less.
Make the operating story visible
Seasonal generation, environmental releases, sediment, and maintenance windows all shape the actual value of a project. When those trade-offs are shown early, design choices become easier to explain and easier to defend.
Design the decision, not just the structure
The strongest early studies leave the owner with a practical sequence: which surveys to do next, which risks to retire first, and which options are worth carrying forward.
Conclusion
Low-flow thinking is not pessimism. It is how hydropower projects become more resilient, financeable, and useful over their full operating life.

